- Projects
George Street welcomes you this Christmas
08/12/2025
Image: Norwood Alterations on George Street, still open for business
On time and on track, the George Street upgrade will deliver a new streetscape with wider, accessible footpaths, trees and garden beds, improved lighting and inviting public spaces.
This transformation is all about creating a place that promotes a safe, healthy and welcoming environment for locals and visitors.
Construction began in early September 2025 and is being rolled out in four carefully planned stages to minimise disruption and maintain access for residents and businesses.
Progress you can see
Stages 1, 2 and 3 are now complete.
The project extends from Harris Street, where essential new stormwater drainage infrastructure has been installed—an important step toward improving local stormwater management and supporting long-term sustainability for the precinct.
This was followed by Stage 2, stretching from Wall Street to Webbe Street on the eastern side of George Street (adjacent to Parade Central), and includes new drainage, kerbing, driveways and paving and landscaping.
Meanwhile, Stage 3—stretching from Webbe Street to The Parade on the eastern side of George Street—is currently undergoing final touches, delivering upgraded infrastructure, paving and new greenery.
Stage 3 landscaping and irrigation installation will occur in the New Year, concurrent with Stage 4 landscaping works.
A pause for Christmas trading
To support local traders and visitors, construction will pause and George Street will be restored to two-way vehicle access during the Christmas trading period (6 December 2025 – 2 January 2026), making it easier for everyone to enjoy The Parade’s festive atmosphere.
Look ahead: Stage 4
The streetscape construction will resume in the New Year on the western side of George Street, including an exciting upgrade to the entrance of the iconic Norwood Concert Hall.
Together, these improvements will enhance the character of the precinct while preserving the historic charm of the Norwood Concert Hall that locals and visitors know and love.
The George Street Upgrade is scheduled for completion in March 2026.
To find out more, visit: George Street Upgrade